Feasibility toolSolar pre-feasibility

Solar project screening

Solar pre-feasibility

Explore an indicative solar project screen before committing to a detailed resource assessment, engineering study or lender-grade financial model.

A practical first screen for developers and investors

The app uses a selected location, a solar output assumption and commercial inputs to produce indicative annual cash flows. You can start with an illustrative resource value, retrieve a location-based value where available, or enter a manual value and keep its provenance visible.

What you can screen

Technology
Solar PV
Capacity capacity
MW in the current calculator; confirm the AC/DC basis for a live project.
Solar output solarOutput
PVOUT in kWh/kWp/year; the current engine applies annual output to capacity.
Commercial inputs tariff
Tariff, PPA term, CAPEX, development and grid costs, OPEX and escalation.
Financing inputs debt
Gearing, tenor, interest, fees, DSRA, debt profile, tax and depreciation.
Outputs irr
Project IRR, post-tax project IRR, equity IRR, DSCR minimum and average, plus annual cash flow.
Capacity basis needs confirmation. The existing app labels capacity in MW. The glossary distinguishes MW (often inverter AC) and MWp (panel DC); confirm the project basis before relying on a result.

Solar resource data

A location lookup calls the EU PVGIS API (PVcalc v5.2, one-unit peak power and a 14% loss setting) and returns annual fixed-system energy, displayed as a rounded PVOUT value. The calculator identifies the result as EU PVGIS when that request succeeds.

Retrieval can fail or be unavailable. In that state, the screen should remain recoverable: enter a manual PVOUT value and treat it as an assumption, not as retrieved site-specific data. A default or manual value is not a substitute for a bankable resource assessment.

Terms: PVOUT and solar output screening limitations

Three-stage workflow

  1. Project and location

    Choose Solar PV, select a location and review the resource state and source.

  2. Assumptions

    Review PVOUT, capacity, CAPEX, tariff, OPEX and the collapsed financing and tax assumptions before calculating.

  3. Results

    Read the cash-flow outputs, source and limitation notes, then decide what needs a more detailed review.

Important limitations

  • Indicative annual modelling is not a site-specific solar yield assessment, engineering design or investment recommendation.
  • Financial outputs reflect user-supplied assumptions and the current implementation; zero development and grid costs are assumptions to confirm.
  • The current screen does not expose every project constraint, contract term or tax treatment that a bankable model may require.
  • Results should not be labelled good, moderate or bad solely from an IRR. Compare any hurdle or covenant explicitly and with the relevant period.

See the assumptions in context

Use the clearly labelled solar example to see how one set of illustrative assumptions flows through the current engine.

Read the illustrative solar PPA screen

Need to resolve the next assumptions?

Discuss a project review with GIA.

GIA can discuss the assumptions behind an indicative screen and possible next steps. The public page does not claim a case study or endorsement.

Request a project review

Relevant expertise: Project Development Advisory and Financial Modelling.